Practical Lean Workshops
Hands-on online sessions focused on solving real manufacturing problems such as cycle time reduction and production downtime reduction.
These hands-on online workshops focus on solving real manufacturing problems such as excessive cycle times, production downtime, and unstable processes, using Lean practice and proven industry best practices.
Participants work directly on their own challenges with expert guidance, achieving actionable solutions, faster implementation, and measurable operational improvements. If your goal is rapid performance gains rather than theory, these workshops are designed for you.
Code: LE11
€1000
How to Reduce the Cycle in the Manufacturing Process
- 4 hours
- 1 session x 4 hours
- LE team: 1
Code: LE12
€1000
How to Reduce the Cycle in the Process of Casting Aluminum Products
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE13
€1000
How to Reduce the Cycle in the Injection Molding Process of Plastic Products
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE14
€700
How to Reduce Downtime in Production
- 4 hours
- 1 session x 4 hours
- LE team: 1
Code: LE15
€1000
How to Reduce Scrap and Rework in Production Processes
- 8 hours
- 2 sessions x 4 hours
- LE team: 1
Code: LE16
€1000
How to Reduce Scrap in the Process of Casting Aluminum Products
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE17
€1000
How to Reduce Scrap in the Injection Molding Process of Plastic Products
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE18
€1500
How to Reduce Scrap in Manual Painting
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE19
€1500
How to Reduce Waste When Changing Colors in Manual Painting
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE20
€1500
How to Reduce Scrap in Robotic Painting
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE21
€1500
Introduction to Quality in the Painting and Coating Process
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE22
€1000
Introduction to Quality in Aluminum Casting Processes
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE23
€1000
Introduction to Quality in Injection Molding Processes
- 8 hours
- 2 sessions x 4 hours
- LE team: 2
Code: LE25
€700
KPI Introduction
- 4 hours
- 1 session x 4 hours
- LE team: 1
Code: LE26
€1000
Organization of the Workday in Manufacturing Companies
- 8 hours
- 2 sessions x 4 hours
- LE team: 1
Code: LE28
€700
Standardization of Production Processes
- 8 hours
- 2 sessions x 4 hours
- LE team: 1
Code: LE29
€1000
Fundamentals of Preventive Maintenance
- 8 hours
- 2 sessions x 4 hours
- LE team: 1
Code: LE30
€1000
Fundamentals of Predictive Maintenance
- 8 hours
- 2 sessions x 4 hours
- LE team: 1
Code: LE32
€1500
Fundamentals of TPM (Total Productive Maintenance)
- 4 hours
- 1 session x 4 hours
- LE team: 1
Contact Us
Have questions about our workshops or need further information? Leave us a message and we’ll respond promptly!